Dammam University Construction of Infrastructure Phase 3 (Underpass)

Dammam University Construction of Infrastructure Phase 3 (Underpass)

Client              : Ministry of Higher Education–Dammam University
Location         : Dammam
Start                : 2013
Completion    : 2017

Project Description

The purpose of this project was construction of infrastructural works (civil, electrical, mechanical) in University of Dammam. The main components of the project were architectural systems including finishes, civil & structural works, electrical works, mechanical works including HVAC & plumbing, construction of utilities, communication works, installation of pipelines, landscaping, road works, infrastructural networks.

Preparatory Year Zone (200 girls) İnfrastructure Works

Preparatory Year Zone (200 Girls) İnfrastructure Works

Client              : Ministry of Higher Education
Location         : Jeddah
Start                : 2014
Completion    : 2015

Project Description

The purpose of this project was development of infrastructure for the girls campus including all civil, mechanical and electrical activities. Project had 40,000 m2 leveling, 39,000 m2 asphalting, 15,000 m2 hardscape/landscape, 3,600 m chilled water piping, 2,370 m potable water piping, 3,450 m sewage piping, 3,350 m irrigation network piping, 5,700 m duct banks.

Execution of Main Chilled Water Piping for Faculty Housing Project

Execution of Main Chilled Water Piping for Faculty Housing Project

Client              : Ministry of Higher Education
Location         : Jeddah
Start                : 2013
Completion    : 2015

Project Description

The purpose of this project was the design and the execution of the main chilled water piping for the faculty housing including all site civil, mechanical & electrical works as well as energy transfer station (ETS).

King Faisal University – Teaching Hospital Al Hassa -Phase 1 & Phase 2

King Faisal University - Teaching Hospital Al Hassa -Phase 1 & Phase 2

Client              : Ministry of Higher Education-King Faisal University
Location         : Hofuf
Start                : 2010
Completion    : 2013

Project Description

The scope of work includes excavation and fitting, storm water system, underground piping and valves, manhole and catch basin work, sidewalks, drinking, RAW & fire water networks, firefighting system, sanitary sewer system, irrigation system, CCTV, CCM & BMS system, telecommunication system, earth work, concreting, architectural work, thermal & moisture protection, conveying systems, pumps, cooling tower, chillers plant, chilled water piping system network, LPG  system & piping network, water distribution system network,  drainage system network.

King Faisal University Infrastructure for the University City Phase 4

King Faisal University Infrastructure for the University City Phase 4

Client              : Ministry of Higher Education
Location         : Hofuf
Start                : 2011
Completion    : 2013

Project Description

The Project composed of drilling 4 each 450 m deep wells, 303,000 m2 asphalt work, 23,456 m2 ground cover, irrigation network, gates for Girls Colleges with 50,000 m2 granite application, waste collection containers, benches, water coolers, fountains, bus-stops and steel fence around the college. Also connection of cables into boys/girls housing, supply of BMS system and infrastructure works for rain drainage, sewage and clear water network beside roads, bus-stops and housing connection as well as the bridge linking from the Girls College to the housing area were performed within the scope of the project.

King Faisal University Infra-structure Work – Phase III

King Faisal University Infra-structure Work - Phase III

Client              : Ministry of Higher Education-King Faisal University
Location         : Al-Hassa
Start                : 2007
Completion    : 2011

Project Description

This project composed of site cleaning, excavation and backfilling works, sanitary sewer system, lift stations, well water system, sweet water network system, raw water network system, effluent water network system, chilled water supply, storm water drainage system, electrical works & communication cable trenches & manholes, MV cables (15kV) feeding main transformer (13.8 kV), low voltage cables (600-1000V), interior & exterior lighting & power outlets, grounding & lightning system. In addition site improvements, road 1,2,3 work, bridge over the east loop road, retaining wall at east loop road, compact substation, outdoor transformer MMC, distribution panels, ATS, diesel generators, SCADA system were also performed within the scope of the project.

Dammam University Infrastructure Work – Phase III

Dammam University Infrastructure Work - Phase III

Client              : Ministry of Higher Education–Dammam University
Location         : Dammam
Start                : 2010
Completion    : 2011

Project Description

This project consists of road & asphalt works, landscaping works, piping works, substation building, walkways & curbstone, building finishing works, chilled water network, power generator system, building electrical works, cabling, panel boards & transformer works.

Dammam University Site Development Base Plan

Dammam University Site Development Base Plan

Client              : Ministry of Higher Education
Location         : Al-Khobar
Start                : 2008
Completion    : 2010

Project Description

The purpose of this Project is; mainly Site Development, Landscaping & Car Parking.

Dammam University Hospital Infrastructure Work – Phase II

Dammam University Hospital Infrastructure Work - Phase II

Client              : Ministry of Higher Education
Location         : Al-Khobar
Start                : 2006
Completion    : 2009

Project Description

This project composed of excavation and filling, storm water drainage system, underground piping and valves, manholes and catch basin works, sidewalks, potable, raw & fire water networks, fire fighting system, sanitary sewer system, irrigation system, CCTV, CCM & BMS systems, telecommunication system, earth works, concreting, architectural works, thermal & moisture protection, conveying systems, pumps, cooling tower, chillers plant, chilled water piping system network, LPG system & piping network, water distribution system network, drainage system network.

Dammam University Permanent Campus Project Phase 1, 2, 3, 4 & 6

Dammam University Permanent Campus Project Phase 1, 2, 3, 4 & 6

Client              : Ministry of Higher Education
Location         : Khobar – Dammam
Start                : 2002
Completion    : 2007

Project Description

The purpose of this contract was the construction of infrastructure, pump stations, storm water pump stations, wells, grading & filling, road works, pavement, site development.

Within the scope of the project there was 525,000 m3 backfilling, 180,000 m2 asphalt road, 140,000 m2 concrete walkway, 27,000 m underground piping which most of them were below the water table, 62,000 m MV, LC and outdoor lighting system, utility building, RO building, underground tank for raw water supply, pump stations buildings and wells and sewage treatment plant with a capacity of 1340 m3/day (Phase 1, 2 & 3).

Moreover, medium voltage, low voltage distribution, BMS/CCMS control systems, telephone & data systems, security CCTV, MATV & PA systems, cooling tower, chillers plant, chilled water piping system network, LPG system & piping network, water distribution system network, sanitary system network, drainage system network were performed as part of the project (Phase 4 & 6).