Dammam University Hospital Infrastructure Work - Phase II
Client : Ministry of Higher Education
Location : Al-Khobar
Start : 2006
Completion : 2009
Project Description
This project composed of excavation and filling, storm water drainage system, underground piping and valves, manholes and catch basin works, sidewalks, potable, raw & fire water networks, fire fighting system, sanitary sewer system, irrigation system, CCTV, CCM & BMS systems, telecommunication system, earth works, concreting, architectural works, thermal & moisture protection, conveying systems, pumps, cooling tower, chillers plant, chilled water piping system network, LPG system & piping network, water distribution system network, drainage system network.