.png)
StormwaterStart Date PendingPending
Implementation Of The Preparation And Opening Of The Shuaib Al-Barshaa Stream and Its Tributaries In The East Of Riyadh
The scope includes excavation work for the path of Shuaib and its tributaries with the implementation of lakes pacification on those paths to reduce the low rates of storm water, with the implementation and casting of channels and box ferries at the intersection of Shuaib and its tributaries with roads. The project also includes the supply and implementation of pipes, connections, manholes, traps to collect rainwater and all accessories and these works are located in the east of Riyadh, and the total lengths of Al-Shuaib and its tributaries is about 63 km.
- Client
- Riyadh Municipality
- Location
- East Riyadh
- Timeline
- Start Date Pending
- Specifications
- Stormwater