City for Humanitarian Services – Superstructure BP-04

City for Humanitarian Services - Superstructure BP-04

Client              : Prince Sultan Bin Abdulaziz Al-Saud Charity Foundation
Location         : Riyadh
Start                : 1997
Completion    : 2000

Project Description

The project was consisting of the construction of superstructure for the following buildings, having total covered area 73,200 m2. (1) Central Plant, (2) Administration and Auditorium, (3) Ambulatory Care, (4) Pedestrian Tube, (5) Loading Dock, (6) Recovery Buildings (M2 throughM4), (7) Rehabilitation Buildings (M5 through M8), (8) Gymnasium.

92 Villas Residential Housing Complex Infrastructure Works

92 Villas Residential Housing Complex Infrastructure Works

Client              : Real Estate Development & Investment Co. (REDICO)
Location         : Riyadh
Start                : 1991
Completion    : 1994

Project Description

The scope of works consists of infrastructural works, site development survey works, sewage and surface drainage system water network as well as installation of all electrical and mechanical works.

Dammam University Construction of University Gates & Boundary Walls

Dammam University Construction of University Gates & Boundary Walls

Client              : Ministry of Higher Education
Location         : Dammam
Start                : 2012
Completion    : 2015

Project Description

The project mainly composed of construction of university gate and 8,000 m boundary wall around all campus with all related infrastructure works including civil, electrical and mechanical works.

Dammam University Gate Infrastructure Work – Phase II

Dammam University Gate Infrastructure Work - Phase II

Client              : Ministry of Higher Education
Location         : Dammam
Start                : 2010
Completion    : 2012

Project Description

The project consists of construction of university entry gate, electrical and mechanical works and CCTV system. 

Dammam University Research Centers Project

Dammam University Research Centers Project

Client              : Ministry of Higher Education–Dammam University
Location         : Dammam
Start                : 2010
Completion    : 2012

Project Description

The project consists of framing works, laboratory equipment, cold store, X-ray radiator, elevators, building mechanical & electrical works.

Concrete Repair Works Khobar Phase 2 Power and Desalination Plant

Concrete Repair Works Khobar Phase 2 Power and Desalination Plant

Client              : Saline Water Conversion Corporation (SWCC)
Location         : Khobar
Start                : 2010
Completion    : 2015

Project Description

The purpose of this project was to carry out the concrete repair works for the concrete structures with jacketing, re-skinning, patch/local repair methods as well as demolishing & reconstruction.
  • Total demolished & reconstructed & repaired area: 109,111 m2
  • Total Concrete Amount: 13,951 m3
  • Total Steel Reinforced: 2,120 Ton
  • Total Structural Steel: 114 Ton
  • Total Excavation & Backfill Amount: 15,647 m3

Concrete Repair Works Shoaibah Phase 1 Power and Desalination Plant

Concrete Repair Works Shoaibah Phase 1 Power and Desalination Plant

Client              : Saline Water Conversion Corporation (SWCC)
Location         : Shoibah
Start                : 2010
Completion    : 2014

Project Description

The purpose of this project was to carry out the concrete repair works of the concrete structures with jacketing, re-skinning, patch/local repair methods as well as demolishing & reconstruction.

  • Total demolished & reconstructed and repaired area: 112,823 m2
  • Total Concrete Amount: 15,777 m3
  • Total Steel Reinforced: 2,430 Ton
  • Total Structural Steel: 489 Ton
  • Total Excavation & Backfill Amount: 26,294 m3

Reinforced Concrete Repair & Arresting of Water Leakage in of Riyadh Emergency Reservoirs Project

Reinforced Concrete Repair & Arresting of Water Leakage in of Riyadh Emergency Reservoirs Project

Client              : Saline Water Conversion Corporation (SWCC)
Location         : Riyadh
Start                : 2006
Completion    : 2010

Project Description

The purpose of this Contract is to implement Repair Damage reinforced concrete and arrested water leakage in compartments R1-C3 and R2-C4 of High Point Reservoirs in Riyadh. This include the provision of materials, equipment, labor and all things necessary for the implementation, completion and maintenance of the works indicated in the Contract, as well as all provisional, additional and complementary works and modifications requested to the Contractor by the Employer as per the Terms and Documents of the Contract.

Murwani Dam Project

Murwani Dam Project

Client              : Ministry of Water and Electricity (MOWE)
Location         : Murwani
Start                : 2004
Completion    : 2010

Project Description

Asphalt rock fill type dam construction with asphalt core in the middle. The crest length 560 m and height from the foundation 91 m. Total of 6 million m3 embankment with 450.000 m3 rock-fill and 28,300 m3 asphaltic core were performed. Construction of uncontrolled overflow type spillway with 160 m crest length. Construction of horse shoe shape 542 m long diversion tunnel with 7 m diameter. Construction of 2.5 m diameter, 137 m long access gallery. Hydromechanics work: Butterfly and Howell Bunger Valves, 160 m long line with 2.5 m Diameter Penstock. Construction of 5 m wide, 3.5 km long asphalt road; construction of 19,800 m2 slurry trench; construction of US and DS cofferdams; grouting works and 29,000 m drilling for grouting.

Damad Dam Project

Damad Dam Project

Client              : Ministry of Water and Electricity (MOWE)
Location         : Damad, Jizan
Start                : 2006
Completion    : 2010

Project Description

The main objectives of this dam was to protect people in the region from the floods, supply raw water for drinking and agricultural purposes. Dam was built with a capacity of 55.5 million cubic meters per day and with an uncontrolled overflow spillway of 4,800 m³/sec capacity. It was a rock compacted concreted (RCC) type dam. Its height was 52 meters and crest length 610 m. Total quantity of concrete used was 384,000m3.